What is the Solar4Kosovo II project?
The Solar 4 Kosovo II project is one of the largest energy projects in Kosovo, which will use solar energy to generate heat. One of the largest solar plants in Europe and the first in the region by capacity.

Together for a greener Prishtina
A development project of the Republic of Kosovo, co-financed by the Federal Republic of Germany through KfW and by the European Union within the Western Balkan Investment Framework “Together for a greener Prishtina”

District heating – soon at your door!
Take the advantage and connect to the district heating network! Termokos, as the operator of the existing system, is ready to expand the network. Your building is located in the expansion area.
Clean energy for a greener Kosovo
A development project of the Republic of Kosovo, co-financed by the Federal Republic of Germany through KfW, the European Union within the Western Balkan Investment Framework and a loan from the European Bank for Reconstruction and Development (EBRD).
Why District Heating?
- Efficient heat from the local heating utility
- Reduces COâ‚‚ emissions
- 100% reliable energy
- Low cost
Data needed
- Detailed calculation of heat load
- Type of existing building
- Heating distribution system
- Existing heating system
- Location of substation in the building

- More economical than all other alternatives
- Safer in operation
- Providing heating from clean solar energy
- No impact on the environment
- Reducing COâ‚‚
- Lakrishte
- Tophane
- Kalabria Extension
- Kalabria Dardha
- Gjinaj South & Old Prishtina
- Mahalla e Muhaxherëve
- About 8,600 new customers
- Enables 50 MW of additional thermal capacity
- Heat storage of 380 000 mÂł water
District Heating Master Plan Assessment
Strategic assessment of urban areas for heating based on COâ‚‚ emission reduction cost-effectiveness
The assessment prioritizes areas with the lowest investment costs relative to COâ‚‚ emission savings potential, ensuring maximum climate impact
- Heat density
- Location
- Existing network capacities and constraints
- Topography and city elevation
- Current composition of heating sources
| Summary | Total Assessed | Selected Areas |
|---|---|---|
| Areas/neighborhoods | 17 | 6 |
| Number of buildings | 1,926 | 199 |
| Heating capacity | 153 MW | 49 MW |
| Annual heat demand | 196 GWh | 62 GWh |
| COâ‚‚ emission reduction potential | 116,216 tons | 48,410 tons |
| CAPEX | €35.6 million | €6.7 million |
| CAPEX/CO2 | €370/ton | €155/ton |
Lakrishte
Tophane
Kalabria Extension
Kalabria Dardha
Gjinaj South & Old Prishtina
Mahalla e Muhaxherëve
The main objectives of our project
Our project aims to transform Kosovo's energy landscape through ambitious and measurable goals.
Reducing CO2 emissions
Lowering greenhouse gas emissions by promoting clean solar energy.
Increasing energy efficiency
Optimizing energy consumption and reducing losses in the energy system.
Energy security
Reducing dependence on energy imports and enhancing Kosovo's energy security.
Modernizing infrastructure
Investing in modern energy infrastructure for a more sustainable future.
District Heating
District heating system components and integration
- Construction of an approx. 1,6 km connection pipeline between solar thermal plant and the nearest point to transmission pipeline ofCHP.
- Construction of an approx. 4,2 km connection pipeline between the solar thermal system and the adjoining district heating network in Tophane.
District heating plant
- Solar collectors with an approx. area of. 63.000 m²
- Seasonal pit thermal storage with a capacity of approx. 380.000 mÂł

News and announcements
Stay informed with the latest news and developments in the field of solar energy.
Documents
Documents in the field of solar energy.
Get your building connected to the district heating network
How to do it? Simple!
- Appoint a representative for your building to get in contact with Termokos.
- This representative will arrange a meeting on site to arrange further details - sign a pre-contract agreement.
Next step
- Make sure your building is part of the district heating extension!
- Just appoint your representative, he will contact Termokos.
Contact Information
Phone
+383 38 541780 13/19
Info@solar4kosovo2.org
Address
Rruga 28 Nëntori, Nr. 181
Prishtinë, Kosovë